RB-1500 draft inputs;not approved site instructions.

Survey actual supports,floor datum,openings/window/door access,drainage and safe fitting path.

Adopt engineering/material/weld/plate/anchor/finish/tolerance design and independent

review/validation plan before release. Fabricate continuous rails/inside vertical-face

strips,round drilled-hole spindles and qualified annular weld/flush-seal details;no splices.

Confirm whole-unit handling from approved measured packed mass,transport/finishing capacity,

lifting/access and temporary edge protection;do not lift from the handrail without design.

Install selected anchors/packers to approved designer/manufacturer method including drill,

clean/embed/cure/torque. Secure fascia stations and BOTH top-wall ties;retain correlated

force/moment design cases. Inspect line/level/gaps,welds,finish and every connection,

record required checks and competent acceptance before removing temporary protection.

Handover as-built/material/weld/anchor/finish records and approved care. Inspect movement,

loose fixings,weld cracks/corrosion/impact;isolate unsafe areas for competent assessment.

No drilling/splicing/modification. Cleaning/repair intervals and warranty await actual finish evidence.