Draft hold points;not approved site instructions.

Survey floor/slab/wall datums and single run. Accept projectdesign,correlated reactions,actual anchors/plateprying,corner/weld/finish qualifications and lifting/temporaryedgeprotection plan before fabrication/siteuse. Set exact fascia rows/stations and both top wallties from accepted drawings. Inspect welds/mitres/fit/coating and anchors to accepted manufacturer installation instructions. Record competent acceptance and asbuilts. Inspect movement/cracks/loosefixings/corrosion/impact;isolate unsafeguard. Cleaning/repair/inspectionintervals/warranty await finish evidence.