HR-SS-1500-35 draft inputs;not approved siteinstructions.

Survey actual stairroute/nosingline,height/clearances/continuity and supportingwall/edges/access.

Accept actions/resistance/material/elbow/saddle/stem/weld/anchor/finish/tolerance design

and independent review/validation plan before manufacture. Returnedends are not supports.

Fabricate accepted copes/saddles/returns and bracket geometry;match actual elbow stock,

grade/wall and qualified WPS. Inspect weld/fit/distortion/finish and tube vent/drain sequence.

Set out exact ALONG-RAIL bracket stations[150.0, 750.0, 1350.0]mm against surveyedstructure.

Install approved anchors to designer/manufacturer drilling/clean/embed/cure/torque,

packing and corrosion-isolation requirements. Do not rely on finishes or returned ends.

Inspect line/level/grip/clearances,all brackets/fixings/welds/finish andspecified tests;

record competent acceptance before use. Handover asbuilt/material/weld/anchor/finishrecords.

Inspect movement,loosefixings,weldcracks/corrosion/impact;isolate unsafehandrail for review.

No drilling/splicing/modification. Cleaning/repair/inspectionintervals/warranty await finish evidence.

